STATUS OF INFRASTRUCTURE IN JNV’S

 

I

Area of land allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on 

: 30 Acores

: YES

: YES

ii

Status of Boundary Wall

a. Brick Wall

b. Barbed wire fencing 

: Completed

But Collapsed in the month of Jun-07 in a heavy storm

iii

Permanent buildings constructed 

: CBRI pattern

iv

School building 

: Complete

v

Dormitories

: Boys 353 Nos. 04

Boys 96 -01 under construction CPWD Pattern

with Warden Residence - Nil

   

: Girls 172 Nos. 03

with Warden Residence - Nil

vi

Kitchen/dining Hall

No. of shifts required for all students to take food 

: 1. One Dining Hall Completed

2. One New dining Hall Under Construction

02 (Two shifts)

vii

Principal Residence 

: 01 No.

viii

Staff Quarters

 

 

: Type III = 16 Nos.

Type II = 12 Nos.

Type I = 12 Nos.

SP Sheds converted into Staff Qrs.: Nil.

ix

M.P. Hall

: Available

x

Workshop

: Available

xi

Type of O.H. Tank

Its capacity

Present Status

: Column based

: 1,35 K. litres

: Working satisfactory

xii

U.G. tank

Its capacity

Present Status


: 1,35 K litres

: Working satisfactory

xiii

D.G. Set

 

 

 

: Available

: KiRLoskar make

: 10 KV

: Working

: Year of procurement - 1995

xiv

Sewage Pump

: Nil

xv

Water Pump

 

01: - 7.5 HP -02

02: - 7.5 HP –01

03. 1.15.HP –01

(Mono Block) – 7.5 HP

xvi

Electrification

Electric connection

Sub Station building

Street lighting

Numbers of hrs. during day when power supply is available on an average.

 

: Rural

: Completed

: 30 Nos. of Poles

: 06 hrs.

xvii

Playfields

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

: Not Available

: 02 Nos. – Available

: 01 Nos. – Available

xviii

Water supply

Tube Well

Hand pump

Connection from PHED 

RO system is installed

: Potable, 05 Nos.- working

: Potable, 05 Nos.- working

: Nil hours supply in a day

ix

Rajiv Gandhi Smriti Van

: Available

xx

Fire fighting arrangement

: Working

xxi

Last date of cleaning of

(a) Septic tank

(b) Water tanks



: 10.06.2007

: 4.11.2007 (O.H.Tank) 5.11.2007 (U.G.Tank)

xxii

Whether area around transformer is fenced

: No

xxiii

Whether open wells, if any, are covered from top

: -N/. A. -

xxiv

Works taken up under M&R fund during current year and last year: -

:

Year

Name of work (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

2007-08

W/wash / painting.

187358

 

 

Repairs/Replacement of doors

44489

 

 

Repairs /Replacement of sanitary fittings etc.

14884

Repairs /Replacement Supply fittings

62000

Purchase of Electrical Items etc.

33097

Electrical works

13590

Replacement of broken glasses

30038

Cleaning campus OHT, Sep. tank

12500

Other Repair works

114108

Total =

512424

 

 

Details of vehicle provided to the Vidyalaya

(i)

Whether vehicle is provided or not (Yes/No)

YES

(ii)

Description to vehicle.

Mini Bus 17 Seater

(iii)

Model no and date of purchase.

Mahendra Pickup S-4 27.04.1993

(iv)

Present condition of the Vehicle. 

Running Condition, But Urgently repairable.

 

HOME    CONTACT US  FEED BACK

 

 Website Designed and Maintaining By  Vindhya Group Technologies Rewa (M.P.)
Best Viewed in 800 x 600 resolution