I |
Area of land
allotted (in acres)
Whether land
transferred in the Name of Samiti
Vidyalaya shifted
to permanent buildings on |
: 30 Acores
: YES
: YES |
|
ii |
Status of
Boundary Wall
a. Brick Wall
b. Barbed wire
fencing |
: Completed
But Collapsed in
the month of Jun-07 in a heavy storm |
|
iii |
Permanent
buildings constructed
|
: CBRI pattern |
|
iv |
School
building
|
: Complete |
|
v |
Dormitories |
: Boys 353 Nos.
04
Boys 96 -01 under
construction CPWD Pattern
with
Warden Residence - Nil |
| |
|
: Girls 172 Nos.
03
with
Warden Residence - Nil |
|
vi |
Kitchen/dining
Hall
No. of shifts
required for all students to take food |
: 1. One Dining
Hall Completed
2. One New dining
Hall Under Construction
02 (Two shifts) |
|
vii |
Principal
Residence
|
: 01 No. |
|
viii |
Staff Quarters
|
: Type III = 16
Nos.
Type II = 12 Nos.
Type I = 12 Nos.
SP Sheds
converted into Staff Qrs.: Nil. |
|
ix |
M.P. Hall
|
: Available |
|
x |
Workshop
|
: Available |
|
xi |
Type of O.H. Tank
Its capacity
Present Status
|
: Column based
: 1,35 K. litres
: Working
satisfactory |
|
xii |
U.G. tank
Its capacity
Present Status
|
: 1,35 K litres
: Working
satisfactory |
|
xiii |
D.G. Set
|
: Available
: KiRLoskar make
: 10 KV
: Working
: Year of
procurement - 1995
|
|
xiv |
Sewage Pump
|
: Nil |
|
xv |
Water Pump
|
01: - 7.5 HP -02
02: - 7.5 HP –01
03. 1.15.HP –01
(Mono Block) –
7.5 HP |
|
xvi |
Electrification
Electric
connection
Sub Station
building
Street lighting
Numbers of hrs.
during day when power supply is available on an average.
|
: Rural
: Completed
: 30 Nos. of
Poles
: 06 hrs. |
|
xvii |
Playfields
400 metre track
40 x 30 metre
basket ball court
40 x 30 metre
volley ball court |
: Not Available
: 02 Nos. –
Available
: 01 Nos. –
Available |
|
xviii |
Water supply
Tube Well
Hand pump
Connection from
PHED |
RO system is
installed
: Potable, 05
Nos.- working
: Potable, 05
Nos.- working
: Nil hours
supply in a day |
|
ix |
Rajiv Gandhi
Smriti Van
|
: Available |
|
xx |
Fire fighting
arrangement
|
: Working |
|
xxi |
Last date of
cleaning of
(a) Septic
tank
(b) Water
tanks
|
: 10.06.2007
: 4.11.2007 (O.H.Tank)
5.11.2007 (U.G.Tank) |
|
xxii |
Whether area
around transformer is fenced |
: No |
|
xxiii |
Whether open
wells, if any, are covered from top |
: -N/. A. - |
|
xxiv |
Works taken up
under M&R fund during current year and last year: -
|
: |
|
Year |
Name
of work (M&R) |
Expenditure
(Rs.
In lacs) |
Cumulative
expenditure during the year |
|
2007-08 |
W/wash /
painting. |
187358 |
|
|
|
Repairs/Replacement
of doors |
44489 |
|
|
Repairs
/Replacement of sanitary fittings etc. |
14884 |
|
Repairs
/Replacement Supply fittings |
62000 |
|
Purchase of
Electrical Items etc. |
33097 |
|
Electrical works |
13590 |
|
Replacement of
broken glasses |
30038 |
|
Cleaning campus
OHT, Sep. tank |
12500 |
|
Other Repair
works |
114108 |
|
Total
= |
512424 |